Helicopters, dive teams and an ageing infrastructure asset. It’s all in a day for our water crews delivering critical projects.  

On behalf of the City of Gold Coast (the City) GCISolutions, (a JV between Ventia and Downer), delivered the renewal of the ageing roof of the Coolangatta reservoir while maintaining water supply reliability and minimising impacts on the local community.  
 
Delivered under stringent safety controls, the project used innovative staging, specialist dive operations and helicopter-assisted material installation, the project successfully delivered a durable, corrosion-resistant aluminium roof designed to withstand harsh coastal conditions and Category 5 tropical cyclone loading. 

Upgrading water infrastructure whilst maintaining operations and continuity of supply requires expertise from design right through to execution. 

This project involved upgrading a critical water asset built in the early 1980s. After decades of harsh coastal exposure, the original steel roof had deteriorated, requiring a modern, long-lasting replacement that could be delivered without interrupting water supply.

Minimising disruption

The hilltop location, combined with sun, salt air, and strong winds, accelerated roof deterioration and created a technically challenging environment. Key challenges for the team were maintaining extended water operations, minimising the shutdown period, ensuring public safety, and delivering a durable solution suitable for a coastal environment. 

Innovative construction

The project team developed a construction methodology that maximised the use of the existing asset while minimising operational disruption. Building the new roof structure over the existing roof reduced the duration the reservoir was offline, helping maintain network reliability. 

The use of construction dive crews to replace internal pipework while the reservoir remained in service further optimised the delivery program and reduced community impacts. Helicopter lifts were implemented due to the site's steep and constrained access, providing a safer and more efficient solution than establishing large crane operations. 

Built to last

The completed structure provides superior corrosion resistance in the harsh coastal environment, reduces future maintenance requirements and delivers a longer service life than the original steel roof. The solution improves asset resilience while reducing whole-of-life resource consumption and maintenance intervention requirements. It is also engineered to withstand the extreme wind and structural pressures associated with a Category 5 tropical cyclone, ensuring strong resilience in severe weather events. 

This project is an excellent example of what can be achieved through collaborative planning, innovative engineering, safe working conditions, and community focused delivery. 

Through close collaboration between the City and GCISolutions, the project successfully renewed a critical water asset while maintaining reliable water services and strengthening the resilience of the network for the community.

 

Project Overview

  • Condition assessment and renewal design of the reservoir roof structure
  • Construction of a new lightweight aluminium roof frame over the existing roof 
  • Replacement of deteriorated roof components 
  • Installation of new aluminium roof sheets and purlins 
  • Helicopter-assisted delivery and installation of roof materials 
  • Online replacement of internal pipework using specialist construction dive crews 
  • Management of reservoir operations to maintain water supply during key stages of construction 
  • Structural upgrades to improve resilience against coastal environmental conditions and extreme weather events 
  • Removal of the existing roof structure following reservoir shutdown 
  • Testing, commissioning and return to service.